Home

Bathroom Renovation – A Step by Step Guide

Bathroom Renovation - A Step by Step Guide

Bathrooms are among the smallest rooms in the home and they’re also one the very costly to renovate. Toilet renovation is a project which, when done well, can add value to your house along with a wonderful space filled with light and design.

Bathroom Renovation - A Step by Step Guide

Toilet design

Bathroom design is the initial space of your toilet renovation you want to get appropriate. Simply replacing the current toilet with exactly the exact same layout might not be adequate. The secret to great bathroom layout would be to design it together with the people who will utilize it in your mind. However make certain that your toilet design also includes an overall usage variable too. For instance: If you’re designing a toilet for families that you might still design the toilet with easy access into the bathtub and shower. This will make sure that the layout would also work for individuals with restricted mobility. This means in the event that you choose to sell your house or even if you’re renovating for gain your layout has a larger market appeal. Fantastic bathroom layout also uses the area nicely, taking into consideration the window or light area, dimensions of fixtures, and drainage choices. Draw out a strategy to scale and directly down the dimensions of your area. Mark that the current drainage issues and water and then inlet points. Now marry both together and see what matches. Notice: Many toilet water and drainage inlet points could be transferred but that does come at additional price.

Toilet remodel

In case you’ve opted to do the job yourself or portion of this job it’s time to hire a skip bin and then pull out the old toilet. If your house was created pre 1980 you might have fibro toilet wall linings with asbestos inside and good care will have to be taken. Check with the regional building council or authority about the regulation on toilet asbestos wall liner removal.

Eliminate everything except the pipes. If you maintain the toilet plumbing set up you won’t need to turn off the water for the entire property. Moreover, you’ll have to port hammer the ground tiles up along with the cement and sand bed that they’re laid on.

Baths have to be construction correctly from the ground up to make sure that the completed job is right and accurate. This also ensures that the layout and Appearance of the toilet will have a Terrific end

The Toilet Renovation Process

Install drainage and water pipe and electric wires.
Install wall liner and ceiling and then put in the tub hob and bathtub.
Waterproof the ground and shower and tub recess.
Correct the autumn of the ground with cement and sand prepared for tiling.
Measure one – Pipes and electric

Careful attention has to be taken when placing the new plumbing so that the pipes fittings are right once the tiling is completed. For instance: To center a fitting at a shower recess you need to take under account the depth of this wall board, tile adhesive and tile therefore the fitting is going to be centred following the tiles are set up. The same is applicable to installing drainage pipes to get a bathroom; the wall liner and tile depth has to be taken into consideration so the pipe is at the right place once the bathroom is installed following tiling. Additionally rough from the any new electric wires without linking them into the mains electricity.

Measure two – Install ceiling and wall linings

Twist up (or nail) that the ceiling liner, plasterboard has become the most usual. But if you’re placing your tiles from floor to ceiling don’t put in the cornice since it is best done following tiling. If you aren’t tiling into the ceiling move right ahead and set up the cornice following the wallboard and ceiling liner have already been set up. In addition, if your bathroom isn’t freestanding now you can comprise the framework and put in the tub. Verify the bathroom is set up properly allowing for the thickness of the tiles and glue.Be certain to look at all linings and plumbing until you proceed with your toilet renovation.

Measure three – legged your toilet

Waterproof your bathroom flooring, shower recess, and round the tub. The shower recess will have to be waterproofed 100mm over the shower increased socket. In addition, the bath ought to be waterproofed 100mm over the lip of the tub right around and into the ground. Your entire toilet needs to currently the tanked, therefore the all water is only going to go down a drain. Toilet waterproofing suggestion: waterproofing is a simple job but precision and quality is the most important.

Measure four – Lay at the cement screed to your flooring.

Ahead of the flooring tiles are able to laid the floor has to be smooth and reasonably flat with a small drop to the drainage outlet. To perform this you need to use cement and sand mix and it’s ideal to put in a waterproofing agent into this too. Having a flat, place the floor level in the door. Use the very best aluminum angle because the final floor level and quantify down the depth of the tile and 10mm for the adhesive. Mark right around the restroom with a flat and then screed on your sand and cement mixture having a 1 to 3 level fall to the peak of the drain outlet. Don’t rush and get it directly with the final level as easy as you can. After the sand cement mix has put but isn’t dry (you may walk on it but also it’s still somewhat soft) rub it over with a house brick. This will eliminate all of the tiny highs and lows and assess with a degree as you move. Allow the toilet floor completely dry and then you ought to have a wonderful surface to tile on.

Measure 5: Tile flooring and walls

Then put your wall tiles making sure that they are flat as you put.

Install all of your pipes faucets and fittings. Fit your new bathroom vanity ensuring it’s sealed and level round the very top with silicone and also seal around the tub. Suggestion: Be sure that they’re in the ideal area before you drill to your own tiles.

Step 7: painting, and cleaning – like

Paint your ceiling and also perform a final clean ensuring everything is fitted properly and that there are no leaks in your pipes. – Love your new toilet.

Be the First to comment.

Leave a Comment